Network design · Equipment and facilities planning

Power for Network Engineers

Calculate the power requirements behind a network design.

34
lessons
12
modules
$299
every paid course, lifetime
Purchases pausedNew signups and purchases are temporarily paused for maintenance. Please check back later.Course content

It costs $299 once, and that one payment opens every paid course we sell, now and later. You keep them for the life of the site, and refunds are available for 14 days, no questions asked.

What you will be able to do

  • Calculate PoE reservations, equipment input, local heat, and rack capacity from a stated basis.
  • Review cable, supply, connection, and environmental constraints before accepting a proposal.
  • Build a load and cost workbook with explicit inputs, checks, and source records.

Why choose this course?

  1. Trace power from the port to the facility

    Distinguish allocation, consumption, apparent power, and local heat. Check the required load after a supply or feed failure.

  2. Prepare evidence for a design review

    Use fictional datasheets, panel schedules, test records, and contracts. Identify missing evidence and the decisions that require qualified facilities or electrical review.

  3. Develop a calculation workbook

    Practice lookup, validation, scenario, and handover formulas in the browser. The documented evaluator supports the taught subset; a production workbook also needs validation in its target spreadsheet application.

Learning roadmap

34 lessons · 12 modules

Thirty-four lessons use direct engineering worksheets. Spreadsheet lessons accept formulas and compare their results under stated input changes. Successful worksheet checks record lesson completion.

Recorded narration accompanies every written lesson page. Use the reader toolbar to pause, seek, and change playback speed, then complete each exercise from its written instructions.

  1. 1. Device power and allocation2 lessons

    Distinguish device draw, declared class, and port reservation. Compare the documented class and negotiation policies before calculating the switch load.

    • Device draw and PoE reservation
    • PoE classification and negotiation
  2. 2. Switch and closet capacity3 lessons

    Calculate the supply-limited PoE budget, evaluate redundancy modes, and trace power through the switch and UPS to the branch input and local room heat.

    • Port ratings and system PoE capacity
    • Power budgets in redundant mode
    • Equipment load and closet heat
  3. 3. Building routes and supply paths2 lessons

    Assess cable routes and their room requirements, then trace rack circuits through panel schedules to identify shared sources.

    • Cable routes and telecommunications rooms
    • Trace rack feeds to their sources
  4. 4. Rack loading and resilience2 lessons

    Calculate rack capacity under stated electrical assumptions. Check phase loading, connections, and the required load after either feed is lost.

    • Rack capacity and phase loading
    • Capacity after a rack feed failure
  5. 5. Access-point design review1 lesson

    Reconcile a 48-access-point proposal with the device modes assumed by its survey, the switch budget, and the software caveat. Compare remedies against the same requirements.

    • Case study: review an access-point power design
  6. 6. Cable conditions and reach3 lessons

    Review bundle conditions, resistance measurements, and overlength routes. Distinguish a failed requirement from missing evidence that needs specialist review.

    • PoE current and bundle heating
    • DC resistance unbalance and four-pair PoE
    • Power and data beyond the horizontal link limit
  7. 7. Allocation policies and reload behavior2 lessons

    Compare the fictional platform allocation modes and their dependencies. Calculate which device services remain powered through the specified reload sequence.

    • PoE allocation methods and reserved power
    • PoE continuity during reload and power restoration
  8. 8. Equipment selection and operating conditions3 lessons

    Include optics in a populated equipment load. Check airflow and temperature limits, then compare supply efficiency, inrush assumptions, and shared power budgets.

    • Optics and configured rack power
    • Airflow direction and altitude limits
    • Supply efficiency, redundancy, and startup current
  9. 9. Facilities requirements3 lessons

    Compare UPS power and runtime limits, connection requirements, and the fictional room checklist. Prepare the evidence needed for qualified facilities and electrical review.

    • UPS ratings, runtime, and input compatibility
    • Rack power inputs and outlet compatibility
    • Closet electrical scope and thermal conditions
  10. 10. Energy, colocation, and cooling3 lessons

    Model annual energy cost from a stated IT-load boundary and PUE assumption. Apply a fictional colocation contract and review the air and liquid constraints of a rack proposal.

    • Energy costs and the PUE boundary
    • Interpreting colocation circuit capacity
    • Assessing fabric placement around liquid-cooled racks
  11. 11. Project load sheets and proposal review2 lessons

    Prepare a power, heat, and weight schedule, then assess an RFP against the supplied project evidence and assumptions.

    • Preparing a power, heat, and weight schedule
    • Reviewing an RFP power response
  12. 12. Calculation workbooks8 lessons

    Write and test formulas for load lookup, closet and rack calculations, validation, scenarios, and handover. Browser checks use a documented evaluator subset; target spreadsheet compatibility needs separate validation.

    • Building a reusable power worksheet
    • Looking up PoE class reservations
    • Calculating a complete closet worksheet
    • Validating worksheet inputs and results
    • Calculating rack line currents
    • Comparing worksheet scenarios
    • Testing spreadsheet formula rewrites
    • Preparing a workbook for handover
Lesson 5 · Calculating closet input power and heatWorked calculation
130.0 + 491.2 = 621.2 the whole DC load621.2 / 0.90 = 690.2 W what the switch pulls in through its cord
690.2 / 0.92 = 750.2 W what the branch circuit carries750.2 - 690.2 = 60.0 W what the unit loses doing it
The fictional closet model distinguishes switch input from the circuit load upstream of its UPS. Fixed efficiencies produce 690.2 W at the switch and 750.2 W at the circuit. Actual cable loss and battery-recharge demand are outside this simplified calculation.

One payment opens this course and every other one

You pay once, and that opens this course and every other paid course we sell, now and later. You keep them for the life of the site, and refunds are available for 14 days, no questions asked.

Open the day you buy:

The courses marked Coming soon on the courses page open to you when each one is released, at no extra cost.

Have a promotion code? You can type it on the checkout page, which shows your total before you pay.

Did you save a spot before we opened? Your $249 price holds until Thursday, October 8, at 9:00 AM Mountain Time. Buy with the link in your email, or ask for it on the saved-spot page.

Purchases pausedNew signups and purchases are temporarily paused for maintenance. Please check back later.

Prices in US dollars. Tax is added at checkout where it applies.